Delivered On Site,
On Program

Fifteen years of scopes delivered inside live tier one operations across the Bowen Basin, with international supply into Southern Africa.

Featured Projects

Scope. Delivery. Result.

CHPP Belt Weigher Installation — Caval Ridge (BMA)
Scope: Supply and installation of a CHPP belt weigher within a live processing environment.
Delivery: TMS scoped, sourced and installed with an onsite crew coordinated around plant operations.
Result: Delivered safely and handed over on schedule with full QA documentation.
De-watering & Disc Filter Installation — Goonyella Riverside (BMA)
Scope: Installation of de-watering infrastructure and disc filter within the CHPP.
Delivery: Multidiscipline onsite delivery: structural, mechanical and piping trades with TMS supervision.
Result: Completed to specification with zero harm and plant returned to service on program.
Dropped Object Prevention Project — Daunia (BMA)
Scope: Site wide dropped object prevention program across live operating areas.
Delivery: Hazards identified, engineered controls fabricated and installed by TMS crews.
Result: Program closed out with full documentation and zero harm.
Project History

Recent Delivery

Peak Downs Mine (BMA)
Seal water line replacement · Re-flux line works · Tyre bay tyre racking · Warehouse refurbishment · 4North compound refurbishment · CHPP clarifier maintenance access
Daunia & Caval Ridge (BMA)
CHPP belt weigher installation · Shutdown and field maintenance crews · Embedded long term trade placements
International Supply
Global procurement and supply into Jwaneng, Botswana: HDPE, consumables and engineered spares delivered at significant landed cost savings through our low overhead supply model.

References available. Site contacts and delivery records can be provided to clients as part of tendering and prequalification. Request project references →

Put TMS On Your Site

1300 737 527 Request a Quote